Project Description: 

The major work consists of improvements to the Groveland CSD water distribution system including the furnish and installation of a submersible multistage well pump with appurtenances, chemical dosing equipment, fiberglass enclosure and concrete foundation. The work also includes the furnish and installed piping, valves, fittings, electrical conduits/wiring, and supplemental improvements to the general site.

Project Cost: 

$951,854.00

Funding Source:

Urban and Multibenefit Drought Relief Grant Award: $8,545,000.00

Four part project includes: AWS Pipeline Relocation, AWS Treatment Plant Relocation, Hardrock Groundwater Well, and Tank & Pipeline Project.

Community Project Bennifit: 

  • Provide water supply security even in worst case scenario drought
  • Improve water quality
  • Reduce maintenance expense

Engineer:

The Engineer for this Project is AM CONSUL TING ENGINEERS, INC. (Engineer), which is to act as Owner's representative, assume all duties and responsibilities, and have the rights and authority assigned to Engineer in the Contract Documents in connection with the completion of the Work in accordance with the Contract Documents. 

Contractor:

Njirich and Sons, Inc. 