New Development and Building

The Groveland CSD was formed to provide water, sewer, fire and park services to the communities of Groveland and Big Oak Flat.  To ensure that new land development and building projects receive our high quality water and sewer services, GCSD has adopted standard construction specifications and standard (engineering) drawings for your use.   Rather than duplicate efforts and expenses, GCSD has adopted the standards of the Tuolumne Utilities District (TUD) as amended.  

The drawings are for representation purposes only, and we suggest you confirm with GCSD staff to determine if any updates have been adopted or for any special requirements are needed your project.  We look forward to serving you!

20200310_GCSD Standard Drawings_adopted.pdf

 

New Construction Water/Sewer Service
For single family residences and smaller projects where water mains are adjacent to property.

Flow Meter ApplicationTemporary Meter ApplicationWater Service ApplicationSewer Service Application

 

New Development Projects
For small and larger residential and commercial developments which require extension of GCSD's water and/or sewer main.

Application for GCSD ServicesWater/Sewer Main ExtensionSpecial District Authorization for Construction Application

 

Fiscal Year 2026/2027

New Meter Charges & Water System Participation Fees

 Meter Size EMU Multiplier Participation Fee Meter Install Charge
5/8" 1.0 $1,827 Actual Device and Labor Charges
3/4" 1.0 $1,827 Actual Device and Labor Charges
1" 1.7 $3,106 Actual Device and Labor Charges
1.5" 3.3 $6,029 Actual Device and Labor Charges
2" 5.3 $9,684 Actual Device and Labor Charges
3" 11.7 $21,377 Actual Device and Labor Charges
4" 20.0 $36,542 Actual Device and Labor Charges

Sewer Service Participation Fee

Participation/Connection Fee $7,000

Water/Sewer Main Extension Fee

Subject to Development Agreement (Contracted Cost or District labor) Actual Cost + 15% Admin Fee
 Inspection Labor Rate $114
New Water/Sewer Service Application $44

Engineering Fees

District Engineering Fee Applicant/Customer request requiring engineering review; contract hourly rate + 15% $160 per Hour
Engineering Deposit $1,500
Easement Abandonment Requests (site inspection, records research, documentation) Non-Refundable Application Fee $262
  Actual District Engineer Fee At District Engineer Hourly Rate (Deducted From $575 Refundable Deposit)
Easement Acceptance Requests ( as a condition of PUE Abandonment) Application Fee $109
  Title Report and County Recording Fees Actual Cost
Encroachment Permit Non-Refundable Application Fee $262
  Non-Refundable Administration Fee $114
  County Recording Fee Actual Recording Cost
  Actual District Engineer Fee At District Engineer Hourly Rate (deducted from $575 refundable deposit)
Service Application for New Development Projects Non-Refundable Application Fee $219
  Non-Refundable Administration Fee $245
  Actual District Engineer Fee At District Engineer Hourly Rate (deducted from $2,500 refundable deposit)
Special District Construction Application Non-Refundable Application Fee $134
  Additional time as needed $90 per Hour
  Inspection fee as needed $114