Alternative Water Treatment (AWS) Plant Pipeline Relocation Project
Project Description:
The major work consists of the furnish and installation of approximately 3,400 linear feet of new 12-inch raw water pipeline, along with essential components such as valves, fittings, air release valves, blow-off systems, etc.
Project Cost:
$1,162,900.00
Funding Source:
Urban and Multibenefit Drought Relief Grant Award: $8,570,000.00
Four part project includes: AWS Pipeline Relocation, AWS Treatment Plant Relocation, Hardrock Groundwater Well, and Tank & Pipeline Project.
Community Project Bennifits:
- Provide water supply security even in worst case scenario drought
- Improve water quality
- Reduce maintenance expense
Engineer:
The Engineer for this Project is AM CONSUL TING ENGINEERS, INC. (Engineer), which is to act as Owner's representative, assume all duties and responsibilities, and have the rights and authority assigned to Engineer in the Contract Documents in connection with the completion of the Work in accordance with the Contract Documents.
Contractor:
R. Sutton Enterprise