Big Oak Flat - Groveland Sewer Collection System Renovation Project

May contain: transportation, vehicle, and soil
Moyle Construction replacing a segment of sewer pipe

The Project involves sewer system improvements in Big Oak Flat, Groveland and Pine Mountain Lake. Specifically, the Project is broken down as detailed below.  Local contractor Moyle Construction started the project in June 2022 and should be completed by June 2023.  

 Sewer system improvements in Big Oak Flat:

• Replace approximately 455 linear feet of 6-inch sewer pipe using open trench excavation methods.
• Rehabilitate approximately 792 linear feet of 6-inch sewer pipe using trenchless cured-in-place methods.
• Perform spot repairs to resolve pipe anomalies at two locations.
• Construct new manholes.
• Bring existing manhole lids up to grade.
• Install sealed or locking manhole lids.

Sewer system improvements in Groveland:
• Replace approximately 408 linear feet of 8-inch sewer pipe and 258 linear feet of 6-inch sewer pipe with open trench excavation methods.
• Rehabilitate approximately 1,413 linear feet using trenchless cured-in-place methods.
• Rehabilitate and install sealed or locking manhole lids.

Sewer system improvements in Pine Mountain Lake:
• Replace approximately 2,715 linear feet of 6-inch sewer pipe using open trench excavation methods.
• Perform spot repairs in sections where pipe abnormalities were detected.